Installation In The I-Fill Filling System For Heating Circuits - Judo SOFTwell Instructions De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation in the i-fill filling system for heating circuits

Fig. 4:
Cable connection at the control
unit
1
2-pin connector
2
3-pin connector
4. Connect LAN-cable
The home network router must be configured so that internal IP addresses are
INFO_NO_HEADER
automatically allocated via DHCP. In general this is the factory setting.
° Plug the LAN cable into the LAN port of the connectivity module (see Module inser-
tion for SOFTWELL P / S and i-soft 5 TGA for SOFTwell P / S as well as for i-soft 5
TGA; see SOFTwell K: Fastening with hook-and-loop adhesive pads / mounting posi-
tion for SOFTwell K).
° Only for SOFTwell P, SOFTwell S and i-soft 5 TGA: Route the LAN cable to the rear
through the opening in the connection flange and secure with cable ties. Carefully
position the cover. Do not clamp any cables!
5. Plug in the power supply unit again
The connectivity module connects automatically to the JUDO server. The connection is
TLS-encrypted to ensure secure data transfer.
6
Installation in the i-fill filling system for heating circuits
1. Unplug the power supply unit.
2. Pull off the front insulation shell of the i-fill (see Figure 6).
3. Insert the LAN and the connection cable into the connectivity module.
4. Insert both plugs of the connection cable into the ports A1 and A2 of the electronic con-
trol unit (see Figure 7).
12
Fig. 5:
1
2
JUDO Connectivity-Modul
Cable connection at the connec-
tivity module
2-pin connector
3-pin connector
1702929 • 2019/08

Publicité

Table des Matières
loading

Produits Connexes pour Judo SOFTwell

Table des Matières