Assembly Recommendations - dirna Bergstrom bycool green line INTEGRAL POWER Instructions De Montage

Masquer les pouces Voir aussi pour bycool green line INTEGRAL POWER:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INTEGRAL POWER
EN
Assembly
Recommendations
• Before starting assembly, please read instructions and
follow them during installation process.
• Use the adequate tools for each operation.
Electricity
• Disconnect ignition key.
• Disconnect battery before starting assembly.
• Make sure electric components are securely connected,
checking their correct fitting.
! Warning
If the unit slants during assembly, wait for at least
60 minutes with the unit in horizontal position before
starting it up.
! Warning
When installing air conditioning equipment on roof, the
upper cabin part must be protected with a cloth or a
protective blanket to avoid possible scratches. When
installing Integral Power on roof, take into account that,
normally, cabins equipped with a hatch have a strong
enough structure to hold equipment weight. However, if it
is not the case and it is necessary to carry out a cut in the
roof or, although it has a hatch, the material is not resistant
enough (if roof is made of fibre, plastic, etc...), it is the
installer who will have to decide, under his responsibility,
if it is necessary to reinforce the roof to avoid possible
deformations, breaks, water entries, etc., habilitating the
means required to stop it from occurring.
With plastic roof cabins, take special care and
only rest on cabin nerves to avoid fibre part from
sinking.
Torx wrenches set
Allen wrenches set
Open-jawed spanner 13
Scissors
Flexo-meter
Related documentation
Mounting instructions
User's guide
Troubleshooting
Parts list
Documentation included
Quick guide
Warranty
Fragile
Beware of cuts!
Electrical hazard
!
The installing personnel must have a sufficient
training in vehicles air conditioning.
!
dirna Bergstrom shall not be responsible for
breakdowns or damages coming from an inadequate
handling or installation of the equipment or from
modifications and substitutions carried out without
our express and written authorisation.
!
Equipment pre-charged with refrigerating gas.
(Do not handle refrigerating gas circuit).
!
Please see product warranty procedure included
in Troubleshooting.
!
Please see equipment User's Guide for its correct
functioning of the remote control and control panel.
!
Once installation is finished, the following documents
must be handed over to the user: User's Guide,
Warranty and Troubleshooting.
!
Attention! Weight of the unit 52 kg.
18
Tools
1001867298
1001869501
1001869522
1001867300
1001069437
220AA10017
Symbology
! Warnings
®

Publicité

Table des Matières
loading

Table des Matières