dirna Bergstrom bycool green line INTEGRAL POWER Instructions De Montage page 20

Masquer les pouces Voir aussi pour bycool green line INTEGRAL POWER:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INTEGRAL POWER
EN
Attach the EPDM seal around the hatch gap
3
(see the details to cut the ends of the seal
joint).
HOW TO CUT THE EPDM SEAL TO PREVENT
!
WATER FROM DRIPPING IN THE CABIN
A- Attach the seal, keeping 100 mm of
protection paper on each side.
B- Remove the two pieces of paper.
C- Attach by pressing both ends.
3
A
Seal
100 mm approx. (protection paper)
B
Seal
C
Seal
20
15 mm
Seal
Cabin roof
Seal
Remove
Seal
®

Publicité

Table des Matières
loading

Table des Matières