dirna Bergstrom bycool green line INTEGRAL POWER Instructions De Montage page 24

Masquer les pouces Voir aussi pour bycool green line INTEGRAL POWER:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INTEGRAL POWER
EN
Secure the attachment supports by turning the
13
nuts to tighten the exterior EPDM seal (Point
4) of the unit between 3 mm and 6 mm; the
seal should have a thickness of between 19
and 22 mm.
Important: To prevent water infiltration into the
cabin ensure the tightness of the EPDM seal
with the base of the equipment as is shown in the
diagram.
3-6mm.
Cabin roof
Turn the nuts until the
rubber seal is tight
13
between 3 and 6 mm.
Tighten (4) M8 nuts to the bracket and (4) to
14
the base of the equipment.
EPDM seal
10 mm*
(*) (approx. after tightening)
13
13
12
24
®
Check the
compression of the
EPDM seal using
a flexometer in the
four corners.
13
14

Publicité

Table des Matières
loading

Table des Matières