dirna Bergstrom bycool green line INTEGRAL POWER Instructions De Montage page 27

Masquer les pouces Voir aussi pour bycool green line INTEGRAL POWER:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INTEGRAL POWER
Mount (4) valves in wastewater pipes.
1
1
Secure with (4) clamps and (4) screws as
2
indicated.
2
Check that they do not interfere with the roof of
3
the cabin, thus ensuring no obstruction.
WASTEWATER PIPES
27
1
2
EN
®

Publicité

Table des Matières
loading

Table des Matières