Installation and Operating Instructions
EN
Decentralised ventilation unit – KWL
6. Unit with removed panel and visible brackets (see Fig. 12).
7. Place the unit over the prepared drill holes for the threaded rods and align with the drill holes for the pipes (see Fig. 13).
8. Properly secure the unit and check that it is secure.
®
Yoga / KWL
11
®
Yoga Style
Fig .12
Fig .13
Fig .14