Tool Requirements; Assembly Instructions - BaSt-ING PumpFast Instructions De Montage Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.

Tool requirements

•  Oil collecting container including funnel for filling hydraulic oil
•  Allen key (4 mm / 6 mm / 10 mm)
•  Open-ended spanners 10 mm / 17 mm / 22 mm (2 pieces) / 27 mm
•  Socket 17 mm including ratchet
•  Hacksaw (O.M.F.B. variant)
•  Cordless screwdriver (Chapel plastic tank)
•  Socket 32 mm (Chapel plastic tank)
5.

Assembly instructions

Variant: PumpFast Basic
•    O pen the lowering throttle of the hand pump to allow possible pressure in the system to escape.
•    D rain the hydraulic oil from the tank using the oil drain plug.
•    S crew the hydraulic pump into the oil drain screw of the hydraulic tank.
•    D ismantle the hydraulic hose from the hand pump head.
•    S crew the T-piece into the existing hydraulic line.
•    T ighten the loose hydraulic screw connections on the complete system.
•    F illing in the hydraulic oil (low-viscosity hydraulic oil is better suited for the PumpFast pump unit 
in cold temperatures, e.g. SAE 0W-15).
Notices
•    A pply additional anti-corrosion agents to the pump and drive shaft on salty roads.
•    A void water deposits on the sealing ring of the drive shaft.
•    W hen the system is pumped up for the first time, there may still be air in the system; 
this escapes when the system is pumped up several times.
(only suitable for round Chapel steel tank)
– 12 –

Publicité

Table des Matières
loading

Table des Matières