Installation • Instalación
Installation • Instalação
inlet
14
Collecting line
Tubo colector
Flow splitter
Distribuidor de
condensado
inlet
Area of installation
• Sealed floor or collecting basin 18
gallons!
It is crucial to ensure that untreated
condensate or oil cannot get into the
sewer system in the event of damage.
• The floor area must be stable and level
(max. inclination 1°) to ensure reliable
functioning of the QWIK-PURE.
With the multiple inlet adapter, up to 4
condensate lines can be connected di-
rectly to the QWIK-PURE unit.
It has three ½" hose connectors for inflow
from the BEKOMAT and one 1" hose con-
nector for the hose to the QWIK-PURE.
The ½" plug on the QWIK-PURE must
not be removed.
1" (DN25)
If there are more than 4 feed points, it
will be necessary to install a header of 1"
diameter above QWIK-PURE inlet (height
1" (DN25)
24" above floor) with a slight slope down
to the QWIK-PURE unit (min. 1°)
Up to 4 QWIK-PURE units can be joined
to a flow splitter.
• Feed in the condensate from the top
(see diagram)
Connecting the feed line:
• The connecting adaptor can be turned
1" (DN25)
in relation to the inflow direction:
- Remove the screws (notice o-ring and
washers of connecting adaptor).
- Place connecting adaptor into position.
- Replace the screws and tighten.
• Connect the inlet hose to any adaptor
inlet point by means of a hose clamp
(use the hose connectors supplied with
the unit).
• Check that the unused inlet points are
tightly plugged!
Note:
Shut off condensate drain outlet until the
oil-water separator has been installed and
is ready to be put into service!
Hoses must always be fixed in such a
manner that they do not make flapping
movements and lead to injuries and/or
damage.
inlet
english
QWIK-PURE 100