Leakage test prior to installation
Installation
Push the WCFIX PLUS with the toilet connector onto the toilet
connection branch or, in the case of front-wall installations,
onto the outlet pipe. Make sure that the connections are fitted
properly.
Connect the DN 50 inlet pipes using plug-in seals or, in the
case of front-wall installations, with sleeves and clips.
Connect the pressure pipe with the pressure port discharge
elbow and hose clips. In the highest point, the pressure pipe
must be extended to avoid a suction lifter.
Buoyancy prevention
Sewage lifting units must be protected against buoyancy. The
installation site should never be flooded.
A hole must be drilled for the wall plug, using a long drill with a
diameter of 10 mm. The anti-buoyancy hanger bolt should later
lie on the tank or have just a small amount of play. Insert the
wall plug and screw the M8, 200-mm-long hanger bolt tightly
into place.
Emergency disposal
ENGLISH
13