Maintenance; Changing Battery; Metrological Verification; To Order - Chauvin Arnoux C.A 1052 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
English
7.2.3 Conformity
Electromagnetical compatibility (norm NF EN 61326-1)

8. MAINTENANCE

8.1 Cleaning
Clean the casing with a cloth and a little soapy water.
Clean off with a damp cloth.

8.2 Changing battery

- Remove the battery cover
- Insert four 1,5V battery
- Replace the battery cover

8.3 Metrological verification

It is essential that all measuring instruments are regularly Calibrated (1 time each year at least).
For checking and calibration of your instrument, please contact our accredited laboratories (list on
request) or the CHAUVIN ARNOUX subsidiary or your local agent.
8.4 Repairs
Repairs under guarantee and outside guarantee.
Please return the product to your distributor.

9. TO ORDER

C.A 1052 ............................................................................................................................. P01.1750.20
Accessories :
Hot-wire straight extension.................................................................................................. P01.1020.10
Hot-wire right angled extension........................................................................................... P01.1020.11
Telescopic extension........................................................................................................... P01.1020.12
Air flow measurement cone C.A 825................................................................................... P01.1731.05
Air flow measurement cone C.A 828................................................................................... P01.1731.07
Pitot tube ............................................................................................................................. P01.1020.48
Page 28

Publicité

Table des Matières
loading

Table des Matières