4. INSTALLATION PROCEDURE

Thank you for installing this charge point. Make sure
there is enough space to properly do the work.
Ensure to work safely and take the safety of others into
consideration as well, always work according to local
safety regulations. Ask the owner if there is anything
of significant importance that requires electricity in the
house, before you turn off the electricity.
When selecting the mounting location of the charge point,
ensure that future maintenance work can be carried out
safely without obstruction.
4.1 PREPARATION
Step 1: Prepare the cabling & RCD and MCB (conform to
local rules & regulations);
Step 2: Indicate which circuit in the distribution board is
connected to the charge point;
Step 3: Turn the socket lid anti-clockwise and out of the
cover of the charge point;
Step 4: Then pull the cover from the rear edge to open
the charge point. Do not use any objects or tools to do
this
4.2 MECHANICAL MOUNT
Step 1: Put the charge point back plate on the wall to
check its positioning (connector at +/- 1 m height). On
the wall, mark the positioning of the top two and bottom
two attachment points of the charge point and select the
appropriate fixtures (plugs, screws and washers);
Step 2: Drill all four holes and put the plugs in place;
Step 3: Secure the charge point to the wall using the top
two and bottom two attachment points. Ensure that the
rubber and stainless steel washers are used and placed
on the back of the charge point at the bottom two
attachment points

4.3 POWER CONNECTION

Step 1: Select the appropriate grommet(s) that suits
the cable(s) thickness and place it in the opening of
the power cable inlet. Lubricate if necessary to make it
easier to feed the power cable through;
Step 2: Secure the power cable(s) using the cable
clamp(s);
Step 3: Connect the power to the terminal blocks, as
indicated in section '2.4.1 Overview of Connections'.
Warning: Keep charge point switched off during
installation!
INSTALLATIEHANDLEIDING – P24
INSTALLATION MANUAL – P24 | P24
4.4 DYNAMIC POWER MANAGEMENT
MODULE
The Dynamic Power Management Module package
contains one Dynamic Power Management module, one
power adapter and one current transformer (CT). The CT
must be connected at the most upstream point of the
house grid, closest to the grid connection. Arrows are
shown on the CT, but direction is not important.
The connection for the CT is located at the bottom of the
Dynamic Power Management module, and is labelled
with L1 on the front label. For a 1 phase installed charge
point the L1 measurement head should match the
conduction which is connected to the L1 of the terminal
block.
Although each measuring head is provided with two
different coloured threads, the polarity of connection is
not important.
Installation procedure
Step 1: Install the Dynamic Power Management module
on the DIN Rail in the fuse box;
Step 2: Connect the CT to the Dynamic Power
Management module, as described in the beginning of
this paragraph;
Step 3: Apply the CT to the grid connection. Make sure
to apply the CT so that the total power usage of the
household is measured on each phase;
Step 4: Connect the power adapter to the Dynamic
Power Management module. One of the two power
adapter wires has a broken white stripe. This wire is the
power adapter GND and should therefore be connected
to the GND pin (right) on the module. The other wire is
the +5 Volts and should be connected to the +5V pin
(left) on the module. The middle pin is not used;
Step 5: Plug the power adapter of the Dynamic Power
Management Module into a power outlet. The PWR LED
must light up;
Step 6: The CS LED will (after a few seconds) indicate a
measured current after the power is on;
Step 7: Clamp a RJ12 connector straight to the UTP
cable for Dynamic Power Management;
Step 8: Feed the UTP cable(s) through the rubber stop(s)
on the data cable inlet of the charge point, as indicated
in section '2.4.1 Overview of Connections';
Step 9: Clamp a RJ12 connector straight to the UTP
cable for Dynamic Power Management;
Step 10: Check if the RJ12 connectors are OKAY with a
network cable tester;
VERSION 0129NM02INT01