Commissioning Procedure - Purmo VIDO 1370071 Manuel D'installation, D'utilisation Et De Service

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

10.0 Commissioning Procedure

1. l Fill and vent the system.
l Open all valves fully and vent air from the heat exchanger.
l Check for leaks at pipe connections.
2. l Refit the outer casing and secure with the 2 screws.
l Switch on the electrical supply.
l Check the operation of the unit by following the operating
instructions.
3. l Set up the installation parameters on the controls system
as necessary.
l When installation and commissioning are complete, hand
over the instruction manual to the end user.
14
2
1
3

Publicité

Table des Matières
loading

Produits Connexes pour Purmo VIDO 1370071

Table des Matières