Installation; Boiler Fixing; Fuel Supply - Riello Burners Gulliver BLU BG7D Manuel D'entretien

Brûleur fioul
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. INSTALLATION

3.1 BOILER FIXING

Fig. 2
6
2
Fig. 3
Put on the flange (1) the screw and two nuts, (see fig. 3).
Widen, if necessary, the insulating gasket holes (4), (see fig. 4).
Fix the flange (1) to the boiler door (3) using screws (5) and (if necessary) the nuts (2) interposing the
insulating gasket (4), (see fig. 2).
Open the boiler door, insert the flame tube (6) on the burner blast tube (7) and fix it with the screw (8).
After installation ensure that burner is lightly inclined as in fig. 5.

3.2 FUEL SUPPLY

1
The burner is designed to allow entry of the oil supply pipes on either side.
Depending on the oil supply pipes position (to the right or to the left hand side of the burner) the fixing plate
(1) and cable clamp (2) should be reversed, (see fig. 6).
2322
8
3
1
Fig. 6
2
3
4
7
5
S7158
GB
D5012
Fig. 4
D5025
Fig. 5
D5345
1

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

391 t13739150

Table des Matières