Heating System Connection; Commissioning; Filling The Tank; Removal From Service - Reflex Storatherm Heat Combi HC500/1 C Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 23

Commissioning

Buffer tank parallel connection
1
Heating feed
2
Heating return
5.3.2

Heating system connection

ATTENTION
Device damage from overheating
Incorrect positioning of the safety valve will cause damage to the pipe connections.
Fit the safety valve between tank and non-return valve.
Do not close the safety valve vent.
6
Commissioning
The responsible installer must explain to the operator how the tank functions and how it is to be used. He/She must draw attention to maintenance work
that has to be carried out at regular intervals. The service life and correct functioning of the tank are dependent on this. The tank must be emptied if there
is a risk of frost, or prior to its being removed from service.
6.1

Filling the tank

Proceed as follows when filling the tank:
1.
Connection to the heating system.
2.
Filling of the tank and system.
3.
Venting of the tank and system.
4.
Checking of the leak-tightness.
7

Removal from service

Remove the tank from service, if malfunctions or leaks occur.
10 — English
3
Consumer feed
4
Consumer return
Storatherm — 09.08.2019
Serial connection of buffer tanks

Publicité

Table des Matières
loading

Table des Matières