Astralpool Heliox UV MP Manuel D'installation page 28

Système de traitement uv
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

2.- Clean and replace if necessary, the fiber filters inside.
3.- Mount again the grid in its position.
7.7. Control of system isolation and connections
FREQUENCY:
You need to check the circuit breaker located inside the control panel at least EACH TIME YOU REPLACE THE UV LAMP, by
pressing the TEST button located on its front.
You need to check the status of all connections, especially the lamp power and the grounding of both the control panel and the UV
reactor, EACH TIME YOU REPLACE THE LAMP.
26

Publicité

Table des Matières
loading

Table des Matières