Venting Requirements - Elica ECP136SS Guide D'utilisation, D'entretien Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

VENTING REQUIREMENTS

Closely follow the instructions set out in this manual.
All responsability, for any eventual inconveniences, damages
or fires caused by not complying with the instructions in this
manual, is declined.
Venting Methods
Use a round transition 10" (25.4 cm) and a round 10" (25.4
cm) duct system for discharge of fumes to the outside.
E
C
B
A
A. 10" ( 25.4 cm)
round transition
B. 10" ( 25.4 cm)
round duct system
Preparation
Do not cut a joist or stud unless absolutely necessary. If a joist
or stud must be cut, then a supporting frame must be
constructed.
Fittings material is provided to secure the hood to most types
of walls/ceilings.
However, a qualified technician must verify suitability of the
materials in accordance with the type of wall/ceiling.
Before making cutouts, make sure there is proper clearance
within the ceiling or wall for exhaust vent.
C
B
D
F
A
C. Ceiling
D. 90° elbow
E. Roof Cap
F. Wall Cap
Ceiling and Duct Considerations
IMPORTANT: This range hood is intended for covered patios or
terraces. This unit must be protected from the effects of weather.
IMPORTANT: The perimeter of the roof must exceed a minimum
of 6" (15.3 cm) the side and front edges of the hood.
Ceiling
Duct
A
D
D
Minimum Ceiling Measurements
ECP136SS
A
36" (91.2 cm)
B
C
D
6" (15.3 cm) minimum
I CAUTION
For gas cooktop installations: Mount the hood so the bottom is
at least 30" (76.2 cm) above the cooking surface.
There is no maximum mounting height, however, we recommend
mounting the hood no greater than 36" (91.4 cm) above the
cooking surface. For every inch (2.54 cm) above 36" (91.4
cm), fume and moisture capture efficiency diminishes at an
increasing rate and may not deliver an acceptable level of
ventilating performance.
IMPORTANT: This range hood model is not intended for carbon
use.
PLEASE READ THE INSTALLATION MANUAL FOR SPECIFIC
APPLICATION.
IMPORTANT: The roof cap and the wall cap must be considered
to prevent the entering from the water. Once installed, it must be
sealed to prevent leaks.
Ceiling
C
Duct
Transition
B
D
ECP148SS
48" (121.7 cm)
32" (81.38 cm)
18" (45.7 cm)
7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ecp148ss

Table des Matières