This procedure must always be completely
!
carried out. This means, first fill and then vent.
Correct method of filling and balancing (lift with Hy-
perFlow system):
• Close the emergency discharge screws „N1"
(14) and „N2" (15).
• Push the
„Lift" button to move the lift upwards
o
without a load to the maximum height.
• Continue holding the
the „Overflow procedure". Oil flows from the hy-
draulic pump through the command and down-
stream cylinders and back into the tank.
• After releasing the
o
a few millimetres and closes the overflow ope-
nings.
• The system is now vented and smooth operation
can happen.
• The lift now has its normal operating function.
4.4

Commissioning

Before commissioning, a single safety inspec-
i
tion must be done (use the „single safety in-
spection" form)
If the lift set up is done by a specialist (factory
trained assembler) then he can also do the safety
inspection. If the set up is done by the operating
company then a specialist must be tasked with the
safety inspection. The specialist confirms seamless
operation of the lift on the set up protocol for sin-
gle safety inspection and releases the lift for use.
i
After commissioning, the set up protocol must
be completed and sent to the manufacturer.
4.5

Changing the assembly location

To change the assembly location the pre-con-
ditions must be met according to the assembly
guidelines. The location change is to be done
according to the following sequence.
• Move the lifting stage upwards to approx. 1,000
mm
• Loosen and remove all hose covers.
• Loosen base plate anchors.
• Lower the lift to the lowest position.
• Disconnect power.
• If necessary, disconnect the hydraulic lines on
the operating unit only, and seal them off with
blind stoppers.
50
o
„Lift" button. This starts
„Lift" button, the lift lowers
JUMBO LIFT 3200 NT - HYMAX XX 3200 PH
• If necessary, suction off the hydraulic oil.
• Transport the lift with the unit to the new set up
location.
• Assemble the lift according to the procedure
during assembly and anchoring before first com-
missioning.
Use new anchors. The old anchors are
no longer fit for purpose!
Before re-commissioning, a safety inspection
i
must be done by a specialist (use the regular
safety inspection form)
4.6

Selecting the anchors

Anchor type
without floor cove-
ring
(screed/tiles)
Heavy
duty
an-
BM 10-15/70/40
chor
Liebig/Strongtie
FH 15/50 B
Fischer
HSL-3-G M10/40
Hilti
Injection anchor
MKT
VMZ-A
25/145
Hilti
HIT-HY 200 with HIT-
Z M12
Fischer
Highbond FHB II-A
S
M12x75/25
i
Similar value anchors and other known brands
of anchor manufacturers can be used when
considering the conditions.
with floor covering
(screed/tiles)
Anchor length de-
pends on the floor
covering
75
M12-
Version 1.0
20110009 OPI