Safety Inspection; Assembly And Commissioning; Set Up Guidelines; Setting Up The Lift - Nussbaum JUMBO LIFT 3200 NT Manuel D'exploitation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

3.1

Safety inspection

The safety inspection is required to guarantee ope-
rational safety of the lift system. It is to be done:
1. before first commissioning after setting up the
lift system
use the „single safety inspection" form
2. After first commissioning, check regularly at
least once per year.
Use the „regular safety inspection" form
3. After changes to the lift system construction
Use the „extraordinary safety inspection" form
Single and regular safety inspections must be
!
done by a specialist. It is recommended to do
maintenance at the same time.
After a change in construction (for example
i
changing the load carrying capacity or chan-
ging the lifting height) and after significant
maintenance on load carrying parts (e.g. wel-
ding work), inspection by a technical expert is
required (extraordinary safety inspection)
This inspection book contains forms with a detailed
inspection plan for safety inspections. Please use
the appropriate form, record the condition of the
inspected system and leave the completed form
in this inspection book.
4

Assembly and commissioning

4.1

Set up guidelines

• Lift set up is done by trained manufacturer perso-
nnel or a contract partner. If the operating com-
pany has appropriately trained assemblers, the
system can also be set up by them. Set up is to
be done according to the assembly instructions.
• A standard system may not be set up in explosi-
on endangered spaces or wash halls.
• Before setting up, verify that there is a sufficient
foundation or make it according to the guidelines
in the foundation plan. The set up location must
be level and even. Foundations in open air and
spaces where winter storms or frost are to be ex-
pected, must have a foundation to frost depth.
The operating company is solely responsible for
the set up location.
• Provide an on-site electrical connection of 3 ~/N
+ PE, 400 V, 50 Hz, fuses with 16 A, slow. The con-
nection point is on the operating unit.
48
• To protect the electrical cable all cable condu-
its are to be fitted with cable sleeves or flexible
plastic pipes.
• After successful lift installation and before first
commissioning, the operating company must
have the lift grounding conductors inspected
on-site according to IEC regulation (60364-6-61).
An insulation resistance test is also recommen-
ded.
4.2

Setting up the lift

Before setting up the lift, ensure that everything
possible is done to prevent accidents due to ca-
reless assembly. This includes, above all, the use
of safe auxiliary means (e.g. cranes, forklifts and a
sufficient number of people), diverse supports and
a sufficient barrier to prevent unauthorized access.
• Carefully remove the lift from the wooden crate
and check for damage.
• Position the lift according to the data sheet at
the desired set up location.
• Set up the unit, connect power supply.
i
The set up location of the operating unit can
be selected from two variants. Either in the
drive-in direction at the front right or left.
JUMBO LIFT 3200 NT - HYMAX XX 3200 PH
Version 1.0
20110009 OPI

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hymax xx 3200 ph

Table des Matières