Step 8 Install the cover.
Bring the cover next to the installed housing, holding the
cover roughly one inch higher. The cover will engage the
housing in this position. Slide the cover down (to engage
the cleat that joins the top of the cover to the top of the
housing). Lightly pull back on the top of the cover to verify
that it is locked onto the housing. (Figure 7)
Step 9 Final assembly screw.
Insert the 2.5" center pin reject, flat head hex screw into
the hole as shown. Start the threads by hand to ensure that
the screw is not cross threaded. Torque to x in-lbs.
(Figure 8)
Installation Instructions – ClearPath Bollard
L2
L1
Ground
Figure 6a. Field Wiring Diagram for 208V and 240V
Figure 7. Cover Assembly
Figure 8.
Cooper Lighting Solutions
IB516115EN
White
Black
Green
Installation instructions
5