Kermi Vplus 20 Instructions De Montage page 5

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 7
Description
1
Bracket base BH460
1
Bracket base BH760
2
Supporting pipe
3
Sealing cap
4
Bracket block
5
Support
6
Hook
7
Washer
8
Hexagon nut
9
Grub screw
11
1
4
10
2
9
7
8
3
Figure centre brackets (MK)
1
-
-
1
1
1
2
2
2
2
1
1
1
1
1
1
1
1
1
1
5
6
1
11
4
2
9
Description
1
Bracket base BH460
1
Bracket base BH760
2
Supporting pipe
3
Sealing cap
4
Bracket block
5
Support
6
Hook
7
Washer
8
Hexagon nut
9
Grub screw
10 Connecting bracket
11 Cheese head bolt
Assignment of stand brackets
Install with the specified assignment of stand bra-
ckets depending on the steel panel radiator's length
(Fig. 3).
Observe all information, especially the technical data
and limitations on use.
Only transport and store in the protective packaging
provided.
Pre-assembly of stand bracket up to BL ≤ 1600
(ZB04620001, ZB04620002)
Prepare tools and fastening materials (screws,
washers and wall anchors) (Fig. 1).
Insert the sealing caps (3) into the two side openings
of the supporting pipe (2) (Fig. 5).
Insert the bracket blocks (4) into the openings provi-
ded in the supporting pipe (2) (Fig. 5).
Screw the grub screw (9) half way into the supporting
pipe (2) (Fig. 5).
Slide the pre-assembled supporting pipe onto the bra-
cket base and set the desired ground clearance (Fig.  7 /8).
Note: Recommended clearance for finished flooring is
200 mm (Fig. 7).
Fix the supporting pipe in place with the grub screw
(9) (Fig. 8).
Insert the support (5) into the top of the bracket base
(1) (recess facing toward the back) (Fig. 8).
For the installation dimensions of the stand brackets
on the radiator, refer to the table in Fig. 10.
2
-
-
2
2
2
2
2
4
4
2
2
1
1
5
5
1
1
2
2
1
1
4
4
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Vplus 33Zb04630001Zb04630002Zb04620001Zb04620002

Table des Matières