STEP 7: Attach the Pipe
1. Connect the oil inlet pipe (#26) to the connector Z 1/2"-M14*1.5 (#60)..
2. Connect the oil return pipe (#78) to the oil return connector of beam.
3. Connect the oil pipe (#62) to the gear pump (#58) tighten with clamp (#61).
STEP 8: Attach the Log Cradle
1. Attach the log cradle (#11) to the beam using hex bolt M10x25 (#82) and nylon lock nut M10
(#17).
43