Zephyr Elica EBN-1100A Guide D'utilisation, D'entretien Et D'installation page 4

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Typical installation
WARNING:
Check installation position so that
once installed, the blower motors
axes work in horizontal.
1
1. Mount on top of ceiling joists.
2. Mount from cross-members tied to trusses.
3. Duct horizontal, mount to cross-members tied to trusses.
4. Mount on underside of rafters.
Note1: when applicable, additional plywood may be used to easy installation.
Note2: Round 10" to 8"Transition should be installed to provide connection from range hood 8"
transition to 10"In-Line blower transition.
Install the round 10" to 8"Transition as much near the range hood as possible.
Plywood
2
4
Plywood
3
4

Publicité

Table des Matières
loading

Table des Matières