Martin Logan Stage X Manuel De L'utilisateur page 23

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Figure 4. Level the stand at the mounting location and mark the holes.
4
Place the bracket against the wall at the desired location.
It is important that the entire area behind the bracket, and
8.5 inches to the left and right of the bracket be free from
obstructions and completely flat.
IMPORTANT! To allow the Stage X to fully rotate up
or down, the following area must be free of obstruc-
tions:
— 4 inches above of the bracket
— 6 inches below of the bracket
— 8.5 inches left and right of the bracket
5
Using a level, square the bracket and mark the 4 hole locations.
Figure 5. Drill pilot holes at the marked locations. Widen any non-stud holes.
6
Using a 1/8" bit, drill four pilot holes.
IMPORTANT! If you drill into a stud during this step,
DO NOT widen the hole and DO NOT install a toggle
bolt wall anchor at this location—you will eventually
be installing a lag screw directly into the stud.
7
Use a 1/2" drill bit, widen the pilot holes so toggle bolt wall
anchors can be installed.
Installation
23

Publicité

Chapitres

Table des Matières
loading

Table des Matières