Planika Pure Flame Notice De Montage page 17

Masquer les pouces Voir aussi pour Pure Flame:
Table des Matières

Publicité

TROUBLESHOOTING
Some alarms are accompanied by a sound signal. Press START/STOP to mute.
DIODES
1.
HOT
FUEL
READY
2.
HOT
FUEL
READY
3.
HOT
FUEL
READY
4.
HOT
FUEL
READY
5.
HOT
FUEL
READY
6.
HOT
FUEL
READY
FUEL
Use only fuels consisting of
and viscous fuels or fuels of improper electric conductivity. The values must be compliant with those of FANOLA®.
Other fuels, such as dehydrated ethanol (i.e. consisting of more than 96,6% by volume ethanol) will cause a device error
and loss of the guarantee.
CLEANING
– Clean with a damp cloth and delicate detergents, only when the device is turned off and cooled.
SERVICE
- (keep the provided USB cable for servicing purposes) We are available on livechat at
1. Ist der Brennstofftank leer (
2. Ersetzen Sie den leeren Behälter durch einen neuen (
3. Schrauben Sie den Verschluss an dem neuen Tankbehälter zu (III).
Die grüne Diode
bedeutet, dass der Kamin betriebsbereit ist.
READY
Drücken Sie START für 3 Sekunden. Die Flammenzündung dauert 2-10 Minuten (
von Kraftstoffdämpfen zu spüren sein a. Die ausgeschaltete Diode READY (
wurde und der Kamin die Betriebstemperatur erreicht hat.
(contact the Service Department if the solution does not eliminate the error)
The device is being cooled. Wait for the green diode
The device run out of fuel while operating. The device is being cooled.
Wait for the red diode to turn off. Refill the tank.
Fuel has spilled in the device. Please contact service department.
Device error. Press and hold ECO for 10 seconds.
Device error. Press the ECO button for 10 seconds.
Room temperature too low (<10°C) or device error. Increase the room temperature.
Press and hold ECO for 10 seconds. Wait for the green diode
ethanol by volume. FANOLA® is the recommended fuel. Do not use gel, thick
86-96,6%
Fuels consisting of 100% by volume ethanol will damage the device.
BRENNSTOFFNACHFÜLLEN
), nehmen Sie den Behälter aus dem Schrank heraus (
I
FLAMMENZÜNDUNG
SOLUTION
) (II).
II
READY
bedeutet, dass die Flamme gezündet
)
READY
17
.
.
www.planikafires.com/service
) (I).
III
). In dieser Zeit kann der Geruch

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Pure flame tv box

Table des Matières