To proceed to the new connection, you mus adhere the following instructions
• Before making the connection, make sure that the installation is protected by a suitable
fuse, see table on next page, and that it is fitted with wires of a large enough section to
supply the appliance normally.
1 - Operations to be carried out on the existing connection (if necessary) :
. Turn the hob against the worktop.
1 . Unscrew the cover
. Remove the screws retaining the terminal block which contains the shunt bars and the
conductors of the supply cord.
. Unscrew the cable clamp to release the power supplying cord.
. Pull out the supply cord.
2 - Operations to be carried out to make a new connection :
. Choose the supply cord in accordance with the recommendations in the table on the next
page.
. The hob must be in situation as shown :
. Pass the supply cord into the clamp.
. Strip the end of each conductor of the supply cord to a 10 mm length, by taking in
account the requested length of the cord for the connection on the terminal block.
. According to the installation and with the help of shunt bars which you should have
recovered in the first operation, fix the conductor as shown on the chart.
. Engage the earth wire yellow/green on the earth terminal, tighten the nut and verify the
continuity of the earth.
. Secure the cable clamp.
. Fix the cover.
1 6
Cable
clamp
2 . The hob is supplied for a single phase
connection : 220-240 V~ or
two phase : 220-240 V2~.
Terminal
block
Shunts
bars
Earth
green/
yellow wire