Mitsubishi Electric Mr.SLIM PUHZ-HRP71HA2 Manuel D'installation page 7

Masquer les pouces Voir aussi pour Mr.SLIM PUHZ-HRP71HA2:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 26
4. Installing the refrigerant piping
A
B
D
C
A Stop valve <Liquid side>
B Stop valve <Gas side>
C Service port
D Open/Close section
Fig. 4-5
(1)
Fig. 4-6
A Valve
I Double spanner section
B Unit side
(Do not apply a spanner other than to this section.
C Handle
Doing so would cause coolant leaks.)
D Cap
J Seal section
E Local pipe side
(Seal the end of the heat insulation material at
F Pipe cover
the pipe connection section with whatever seal
G Service port
material you have on hand so that water does not
H Wrench hole
infi ltrate the heat insulation material.)
B
C
Fig. 4-8
4.6. Addition of refrigerant
• Additional charging is not necessary if the pipe length does not exceed 30 m.
• If the pipe length exceeds 30 m, charge the unit with additional R410A refriger-
ant according to the permitted pipe lengths in the chart below.
* When the unit is stopped, charge the unit with the additional refrigerant
through the liquid stop valve after the pipe extensions and indoor unit have
been vacuumized.
When the unit is operating, add refrigerant to the gas check valve using a
safety charger. Do not add liquid refrigerant directly to the check valve.
Permitted pipe
Model
length
HRP71,100,125
-75 m
Model
For single combination
(1 indoor unit)
HRP200
For twin / triple /
quadruple combination
(2-4 indoor units)
B
A
C
D
E
F
G
E Local pipe
F Sealed, same way for gas side
G Pipe cover
H Do not use a wrench here.
Refrigerant leakage may result.
I Use 2 wrenches here.
(2)
Fig. 4-7
* The fi gure to the left is an example only.
A
The stop valve shape, service port position,
etc., may vary according to the model.
* Turn section A only.
(Do not further tighten sections A and B
together.)
D
C Charge hose
D Service port
Permitted vertical
difference
31 - 40 m
-30 m
0.6 kg
30 m and less
31-40 m
1.4 kg
No additional
charge necessary
0.9 kg
4.4. Refrigerant pipe airtight testing method (Fig.4-5)
(1) Connect the testing tools.
• Make sure the stop valves A B are closed and do not open them.
• Add pressure to the refrigerant lines through the service port C of the liquid
H
stop valve A .
(2) Do not add pressure to the specifi ed pressure all at once; add pressure little by
little.
1 Pressurize to 0.5 MPa (5 kgf/cm
sure does not decrease.
I
2 Pressurize to 1.5 MPa (15 kgf/cm
pressure does not decrease.
3 Pressurize to 4.15 MPa (41.5 kgf/cm
perature and refrigerant pressure.
(3) If the specifi ed pressure holds for about 1 day and does not decrease, the pipes
have passed the test and there are no leaks.
• If the surrounding temperature changes by 1°C, the pressure will change by
about 0.01 MPa (0.1 kgf/cm
(4) If the pressure decreases in steps (2) or (3), there is a gas leak. Look for the
source of the gas leak.
4.5. Stop valve opening method
The stop valve opening method varies according to the outdoor unit model. Use the
appropriate method to open the stop valves.
(1) Gas side (Fig. 4-6)
1 Remove the cap, pull the handle toward you and rotate 1/4 turn in a counter-
clockwise direction to open.
2 Make sure that the stop valve is open completely, push in the handle and rotate
the cap back to its original position.
(2) Liquid side (Fig. 4-7)
1 Remove the cap and turn the valve rod counterclockwise as far as it will go with
the use of a 4 mm hexagonal wrench. Stop turning when it hits the stopper.
(ø9.52: Approximately 10 revolutions)
2 Make sure that the stop valve is open completely, push in the handle and rotate
the cap back to its original position.
Refrigerant pipes are protectively wrapped
• The pipes can be protectively wrapped up to a diameter of ø90 before or after
connecting the pipes. Cut out the knockout in the pipe cover following the groove
and wrap the pipes.
Pipe inlet gap
• Use putty or sealant to seal the pipe inlet around the pipes so that no gaps re-
main. (If the gaps are not closed, noise may be emitted or water and dust will
enter the unit and breakdown may result.)
Precautions when using the charge valve (Fig.4-8)
Do not tighten the service port too much when installing it, otherwise, the valve core
could be deformed and become loose, causing a gas leak.
After positioning section B in the desired direction, turn section A only and tighten it.
Do not further tighten sections A and B together after tightening section A.
* After charging the unit with refrigerant, note the added refrigerant amount on
the service label (attached to the unit).
Refer to the "1.5. Using R410A refrigerant air conditioners" for more informa-
tion.
• Be careful when installing multiple units. Connecting to an incorrect indoor unit
can lead to abnormally high pressure and have a serious effect on operation
performance.
Additional refrigerant charging amount
41 - 50 m
1.2 kg
A+B+C+D
Amount of additional refrigerant charge (kg)
41-50 m
2.8 kg
1.8 kg
G), wait 5 minutes, and make sure the pres-
2
G), wait 5 minutes, and make sure the
2
G) and measure the surrounding tem-
2
G). Make the necessary corrections.
2
51 - 60 m
61 - 75 m
1.8 kg
2.4 kg
51-60 m
61-70 m
4.2 kg
5.6 kg
Calculate the amount of additional refrigerant
charge using formula provided next page
71-80 m
7.0 kg
7

Publicité

Table des Matières
loading

Table des Matières