3. Installation
Delivery Of Unit
• During transportation to delivery of the fancoils in high quality without any damage from
Daikin production facilities, proper packaging and controls of the units should be done.
•Immediately after the delivery,check all products carefully. When the damage is seen,
specify the event on the carrier's freight bill and to show damage please request observer
from the carrier.
•You can do by telephone or upon person, but always verify on the freight bill.
•To specify the size of damage or loss of the shipped product ,the carrier should be opened
under the supervision.
•Report should be prepared in order to claim, by keeping the original report in the receiver
a copy of the this report should be forwarded to the transportation company by shipper.
Placement Of The Unit
OBSTACLE
CAUTION!
1. Do the following checks before installation and operation.
2. Have adequate space for installation and maintenance. Please refer to the unit size and
the connection diagram. (Figure 2 : Gaps around the unit shows the required minimum
space.)
3. Make sure you have adequate space for piping and electrical connections.
4. Make sure that the carrier rods can withstand the weight of the unit.
5. For proper operation of the unit and the condensed water discharge , installation of
the unit should be done in the horizontal.
6. Channel external static pressure, is designed to be within the range of static pressure
7. The installer must supply service valves and insulation for water piping in accordance
with the local code and regulation.
8. People who carry out installation , ensure the service valves local codes and set up
according to the rules.
9. Before installation and service transactions are done ,main switch of the unit should
A ≥ 400 mm B ≥ 200 mm H ≥ 400 mm
B
OBSTACLE
CEILING
Figure 2
11
A