Fixing To The Fl Oor; Controlling The Safety Devices; Inspection Test; Moving The Rack - Corghi BL 600 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

The fi xing to the fl oor (compulsory) must be done on a level concrete fl oor at least
20 cm thick, with a minimum concrete quality of B25 in compliance with DIN 1045
requirements (foundations), by using M10 anchor plug (standard supply) with torque
wrench corresponding a 45 Nm.
(Fig.6)
A
Normal anchoring directly to concrete
B
Additional covering over concrete (if any)
C
Floor slope with levelling shims
In the case of the recessed model, a pit will be required having the following dimen-
sions (ONLY BL 600):
length
width
depth
Fit an angular profi le along the edge of the pit (2320X870Xh155).
Each time the rack is commissioned, make one empty rise and fall and check that it
runs smoothly and the mechanical safety lock engages properly (A fi g.8) on its check
latch (B fi g.8).
With reference to the directive 98/37, the coeffi cients for the under loaded tests are
respectively:
DYNAMIC LOAD 1,1
STATIC LOAD
Sharing out loads according to Fig.17 for standard lift.
For the test of the version with lateral extension, distribute such loads by referring to
the geometry shown in fi g.17a.
Follow these steps if you have to move the rack:
a) Remove the fl oor anchor.
b) Fully lower the lift.
c) Disconnect the lift from all power sources.
d) Lever under one side of the base to slightly raise the lift from the ground
e) Insert the lift truck forks under the base and allow the lift to slide on to the forks
GB
themselves
f) Position the lift in the desired place.
Once the rack has been moved to its new position, follow the installation procedures
described in this chapter.
24
Fixing to the fl oor
2320
870
155

Controlling the safety devices

Inspection test

1,25

Moving the rack

Operator's manual BL 600

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bl 600 m

Table des Matières