Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INFLATION

INFLATION
Inflate your Board with the GONG Pump supplied with your Board. This pump has the required inflation
capabilities, tips and seals compatible with the Valve of your Board.
1 - Choose a soft, clean surface to unroll your
material.
3 - Make sure the Valve knob is in the up
position for the inflation phase. Just press
the button and turn it to the right or left. If you
do not follow this recommendation, the board will
deflate when removing the hose from the valve.
5 - Inflate to required pressure, which must be
15 PSI. It is normal to hear a small whistling of
air at the Pump hose during inflation. Indeed, the
tightness of the pipe is never perfect, but the
losses are insignificant. Likewise, the Pressure
Gauge needle will only begin to move when
the internal pressure of the board exceeds
EN
2 - Open the inflation Valve cap on the front of the
board.
Before proceeding with your first inflation, tighten the
valve with the black key that comes in the repair kit to
insure perfect functioning (instructions in upkeep and
maintenance).
4 - Insert the Pump hose by screwing it in a quarter
turn.
5 PSI : it is therefore normal that it does not work
from the first strokes Pump.
6 - Once the Board is inflated, disconnect the tip of
the pump, turning it a quarter turn and close the
Valve cap to seal it.
- 12

Publicité

Chapitres

Table des Matières
loading

Table des Matières