Abus TVIP81000 Mode D'emploi page 26

Version 05/2013
Masquer les pouces Voir aussi pour TVIP81000:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 38
4.2 Installation suspended from the ceiling
Before starting:
The following points are prerequisites for installation:
At least 250 mm must be free above the ceiling.
The ceiling must be at least 5 mm and up to 40 mm in thickness.
The ceiling must be strong enough to bear more than 4 times the weight of the Speed Dome and its
accessories.
1. Turn the dome anti-clockwise to open it and remove it.
2. Remove the lens protector, the foam and the adhesive strips from the dome.
3. Then fit the dome back onto the Speed Dome.
Lens protector
4. Drill a hole in the ceiling using the drill template provided to help you.
5. Connect up all the cables required and switch on the power supply.
Then check the red power LED.
When the test is successful, switch off the power supply again.
Dome
Adhesive strips
26
Foam
Dome
English

Publicité

Table des Matières
loading

Table des Matières