Astralpool 42350 Smart+ 60 Manuel D'installation Et D'entretien page 9

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 31
4.3. Electrical connection of the electrolysis cell
Make the interconnection between the electrolysis cell and the power supply according to the following scheme. Due to relatively high current
intensity circulating do not modify or cut either the length or section of the supplied cables without making a previous consultation to an
authorized Astralpool distributor. The cable connecting the electrolysis cell and the power supply should never exceed the maximum length
recommended in this Manual: Smart+ 60 / 42350 / 52569, 7.5 m.; Smart+ 100 / 42351 / 52570, 4 m.; Smart+ 160 / 42352 / 52571, 3 m.
4.4. Installation of the external flow detector
SMART+ SYSTEMS (42350, 42351, 42352)
Besides the internal flow detector (gas detector) installed in all Astralpool Chlore equipment, the Smart+ range systems have an additional
mechanical flow detector (flow switch).
1.
Install the saddle in a section of the pipe at the entrance to the electrolysis cell. It should always be installed in a horizontal position
relative to the ground (see Fig. 4).
2.
Install the supplied flow detector (flow switch) vertically in the saddle (Fig. 10a).
3.
There is an arrow on the head of the flow detector. Make sure that this arrow is parallel to the pipe shaft and pointing in the
direction that the water flows (Fig. 11a).
4.
Do not install the flow detector near magnetic objects. They could affect the operation of the magnetic device it contains and
reduce its reliability.
Fig. 10a
1.- Electrode 1 (Red)
2.- Electrode 2 (Red)
3.- Flow detector (Yellow)
Fig.9b
7
Fig. 11a

Publicité

Table des Matières
loading

Table des Matières