Precautions - Hayward Z Série Manuel D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

The parts in contact with the liquid have been chosen in order to guarantee perfect compatibility with most chemical
products normally in use. Given the range of chemical products available on the market, we recommend checking
the chemical compatibility of the dosed product and contact materials.
MATERIALS USED IN THE PUMP HEAD (STANDARD)
BODY:
CONNECTORS:
DIAPHRAGM:
BALL VALVES:
The pumps are supplied complete with the indispensable accessories for their correct installation. You will find the
following in the packaging:
Foot filter, injection valve, transparent suction tube, transparent tube for bleed valve, opaque delivery tube, Pump
fixing inserts, bracket for wall mounting, level sensor connector and instruction manuals.
READ THE FOLLOWING PRECAUTIONS CAREFULLY BEFORE PROCEEDING WITH PUMP INSTALLATION
CAUTION! PRODUCT INTENDED FOR PROFESSIONAL USE, BY SKILLED PEOPLE
CAUTION! ALWAYS DISCONNECT THE POWER SUPPLY BEFORE INSTALLING OR CARRYING OUT
CAUTION! FOLLOW THE SAFETY PROCEDURES RELATIVE TO THE DOSED PRODUCT
CAUTION! WE RECOMMEND INSTALLING THE PUMP IN A VERTICAL POSITION TO ENSURE PROPER
Problem free installation can be achieved by taking due care when handling, installing and commissioning the
pump.
H
SO
SULPHURIC ACID All the pumps are tested with water. When dosing chemical products that may react
-
2
4
with water, dry all the internal parts of the plumbing thoroughly. To do this, you will need to power the pump
and run it at maximum speed with the delivery valve turned downwards. After running for a few minutes, check
to see whether water is still coming out.
-
Install the pump in a zone where the environment temperature does not exceed 104º F and the relative
humidity is below 90%. The pump has an NEMA 4X protection level.
-
Install the pump so that any inspection and maintenance operations are easy to carry out, then secure the
pump firmly in order to prevent excessive vibrations.
-
Check that the power supply available in the network is compatible with that indicated on the pump label.
-
If you are injecting in pressurised pipes, always make sure that the system pressure does not exceed the
maximum working pressure indicated on the dosing pump label before starting up the pump.
WIRING
A
H
N
A
EM00136341
PVDF
PVDF
PTFE
CERAMIC

PRECAUTIONS

MAINTENANCE ON THE PRODUCT
Input A = power
supply
B
Input B = Level
B
OR MAINTENANCE
OPERATION.
The pumps have been designed to absorb
small over voltage. Therefore, in order to
prevent the pump from being damaged, it is
always preferable to ensure that the pump
does not have a power source shared with
electrical appliances that generate high
voltages.
Connection with the three-phase 440V line
should only be made between hot and
neutral. Connections must not be made
between hot and earth.
rev.1.0 EN
2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Z100Z200Z500

Table des Matières