1
1.
First, the distance from the wall-mount frame (38) to the ground is 2,560 mm.
2.
Then, mark where the holes should be made according to the position of wall-
mount frame
3.
Drill the holes according to the markings on the wall.
2
1.
Install two M8X80mm steel bolts (A25) in the top two holes.
2.
Install the four M8X46 plastic expansion pipe (H1) into the wall.
3
Attach the arm bracket (11) using two M8X40mm Bolts (A4) and two M8 locknuts
(C2) into the blackboard (19).
Repeat this step on the other side of the weight system.
4
RIM (20): Attach the backboard bracket (10) to the Rim (20) using four M8X50mm
bolts (A5), four M8 spring washers (G1), four M8 washers (D2), four M8 locknuts
(C2) assembly to blackboard (19).
DUNK RIM (48): Attach the Backboard Bracket(10) and Dunk Rim (48) with four
M8X50mm Bolts (A5) , four M8 Spring Washers (G1) , four M8 Washers (D2), to
Blackboard (19).
5
Attach the adjustment bracket (39) using an M10X115mm bolt (A16) and M10 lock-
nut (C3) into the backboard bracket (10).
6
1.
Attach the upper arm (7) to the arm bracket (11) using the M10X60mm bolt
(A11), two M10 plastic washers (15), and an M10 locknut (C3).
Repeat this step on the other side of the weight system.
Do not tighten the bolt yet.
2.
Attach the bolt sleeve (70) to upper arm (40) using an M12X225mm button head
bolt (A26),two M12 washers (16) and an M12 locknut (C4).
Do not tighten the bolt yet.
7
Attach the short arm (42) to the backboard bracket (10) using an M12X225mm Bolt
(A22), two M12 washers (16), and an M12 locknut (C4).
Do not tighten the bolt yet.
10
Use the accompanying assembly
drawings starting on page 47
Galaxy
Basketball Systems