General information
1) Main Unit Construction
1. Top cover
2. Door
3. Ice-making & water tank assembly
4. Front panel
5. Operation panel
6. Air outlet: Must keep the air circulate smooth-
ly, hot air will blow out when unit running.
A. Water dividing pipe: with nine little holes, wa-
ter will flow out from these little holes.
B. Evaporator (ice-making module)
C. Ice full detecting board.
D. Water tank.
E. Water supplying pipe.
7. Water draining port.
8. Water inlet port for water supply.
Accessory: White 2 meters long water drain pipe,
connector for the water faucet, white 3 meter
long water supply pipe(ø 6.35mm).
F. Cover board on the right side of the evaporator.
G. Water level switch installing plate.
H. Water drain pipe of the water tank.
I. Water pump.
J. Water level detecting switch.
EN
7