Dimension Chart - SCS Sentinel intensive1A Safety kit Manuel D'installation Et D'utilisation

Pour portail à battants
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

B

DIMENSION CHART

Comply with the measures shown on the chart for proper installation. Adjust the gate structure
to fit it for best automation, if necessary.
Before preceding the installation, be sure that gate moves freely and that:
1) Hinges are properly positioned and greased.
2) No obstacles in the moving area.
3) No frictions between two gate leafs or with the ground while moving
2

Publicité

Table des Matières
loading

Produits Connexes pour SCS Sentinel intensive1A Safety kit

Ce manuel est également adapté pour:

Intensive1a comfort kit

Table des Matières