Assembling The Rack - Gladiator Garageworks GEARLOFT GALS24M1KG Instructions D'assemblage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1.
Determine the ceiling bracket
locations
Parallel layout
24"
P2
P2
48"
P2
P2
48"
2' x 4'
24"
48"
P2
P2
Perpendicular layout
24"
48"
P2
P2
26"
P2
P2
2' x 4'
48"
P2
P2
P2
The storage rack ceiling brackets can be positioned parallel
or perpendicular to the wood ceiling joists/rafters. Determine
the application required for your desired installation. If drywall
covers the joists, use a stud finder to determine the joist/rafter
locations and mark with masking tape. For applications requiring
installation of the brackets perpendicular to the joists/rafters, the
maximum distance between them is 24". The brackets included
allow for a 24" maximum span. See figure for typical ceiling
layouts. Mark the location of the ceiling brackets on the joists/
rafters or drywall, making sure the vertical supports can be
positioned between the lag bolts used to attach the brackets.
Position the center of the brackets on a 24"/48" grid as required.
8

Assembling the Rack

P2
48"
P2
P2
4' x 4'
P2
24"
P2
48"
P2
P2
2' x 8'
48"
P2
26"
P2
P2
P2
24"
48"
P2
26"
P2
2' x 8'
2.
Attach the ceiling brackets
48"
P2
F2
P2
F2
Using the provided drill bit (3/16"), drill all pilot holes in the center
of the joists/rafters. Two lag bolts must be used on each bracket,
48"
one on each side of the vertical support. Mount the ceiling
brackets (P2) using 5/16" x 3" lag bolts (F2) (8 or 12).
P2
4' x 4'
P2
F2
P3
Corner Support
(4 Required)
P4
F2
P5
P6
Center Support
(If Required)
F2
5/16" x 3" Lag bolt

Publicité

Table des Matières
loading

Table des Matières