1. DESCRIPTION

15
9
8
7
6
11
5
14
Boiler
Ritorno
return
caldaia
Fig. A

1.1 Construction

 No. 1 delivery bar for floor-mounted system with lockshields or flow-
rate meter (where applicable);
 No. 1 return bar for floor-mounted systems designed to be fitted with
electrothermal heads (where applicable);
 No. 1 collector fixing bracket (where applicable);
 No. 1 mixing unit fixing bracket;
 No. 1 mixing valve with M30x1.5 thread designed for the installation
of a thermostatic head with an immersion probe from 20 to 65°C
(where applicable) or an electric servomotor (not supplied);
 No. 1 calibration valve and bypass (fixed point thermostatic regula-
tion) - no. 1 housing for return probe (climate adjustment);
 No. 1 cabled Wilo Yonos PARA RS 25/6 electronic circulator with
three-pole cable L=1000 mm (where applicable);
4
10
4
Boiler
Mandata
delivery
caldaia
 No. 1 housing for delivery temperature probe;
 No. 1 control thermometer from 0 to 80°C;
 No. 1 ½" automatic air relief valve;
 No. 1 thermostatic head with immersion probe from 20 to 65°C
 No. 1 check valve (not shown in the figure)
 No. 2 inlet/outlet valve and safety plug (where applicable);
 No. 1 ball valve kit (not supplied);
 No. 1 box with safety thermostat for low-temperature circulator
(fixed-point adjust.)
cabling (optional) or no.1 6T standard control unit for electrothermal
heads (optional)