Weber Summit 43176 Guide De L'utilisateur page 4

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4
LOCATING YOUR LP TANK CABINET
When determining a suitable location for your LP Tank Cabinet installation, give
attention to concerns such as exposure to wind, proximity to traffi c paths, and keeping
any gas supply lines as short as possible. Never locate the Summit
in a garage, breezeway, shed, under an unprotected overhang, or other enclosed area.
Locate the LP Tank Cabinet and structure so there is enough room to safely evacuate
the area in case of a fi re.
CLEARANCE FROM COMBUSTIBLE SURFACES OR STRUCTURES
WARNING: Clearance from the outside walls of the sides and
back of the LP Tank Cabinet must be a minimum of 24 inches
(610 mm) from any surface. Refer to "Typical Gas Supply
Installation" before starting installation.
WARNING: The structure, "island" counter tops and adjacent
work areas for the LP Tank Cabinet installation must be built
from noncombustible materials only.
NOTE: If you have questions on what materials are
considered noncombustible, contact your local building
supplier or fi re department.
BUILT-IN STRUCTURE CUTOUT DIMENSIONS
All dimensions are to fi nished surfaces.
WARNING: All counter top fi nished surfaces must be
constructed of a noncombustible material.
GAS INSTRUCTIONS
®
LP Tank Cabinet
b
1
a
b
c
A
B
C
c
1
1
a
BUILT-IN CUTOUT DIMENSIONS
S-440, S-640
24" (610 mm) minimum*
LP Tank Cabinet
Any Surface
Non-Combustable Surface
TANK CABINET CUTOUT DIMENSIONS
S-440
20 3 / 4 ˝ (527.05 mm)
27 1 / 2 ˝ (698.5 mm)
14˝ (355.6 mm)
1
b
TOLERANCES
+ 1 / 4 ˝ - 1 / 4 ˝ (6.35mm)
+ 1 / 4 ˝ - 1 / 4 ˝ (6.35mm)
+ 1 / 4 ˝ - 1 / 4 ˝ (6.35mm)
WWW.WEBER.COM
®

Publicité

Table des Matières
loading

Table des Matières