Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

DRYER INSTALLATION INSTRUCTIONS
INSTRUCTIONS POUR L'INSTALLATION
Table of Contents
DRYER SAFETY ......................................................................... 2
INSTALLATION REQUIREMENTS ............................................. 4
Tools and Parts ...................................................................... 4
LOCATION REQUIREMENTS .................................................... 5
ELECTRICAL REQUIREMENTS - U.S.A. ONLY ....................... 7
GAS DRYER POWER HOOKUP ................................................ 8
INSTALL LEVELING LEGS ....................................................... 10
Power Supply Cord Connection ......................................... 12
Direct Wire Connection ....................................................... 14
MAKE GAS CONNECTION ...................................................... 17
VENTING ................................................................................... 18
Venting Requirements ......................................................... 18
Plan Vent System ................................................................. 19
Install Vent System .............................................................. 20
CONNECT VENT ...................................................................... 22
LEVEL DRYER .......................................................................... 23
COMPLETE INSTALLATION CHECKLIST .............................. 23
DOOR REVERSAL (OPTIONAL).............................................. 23
INSTALLATION NOTES
_________________________________
Date of purchase:
________________________________
Date of installation:
________________________________________
Installer:
___________________________________
Model number:
____________________________________
Serial number:
DE LA SÉCHEUSE
Para una version de estas instrucciones en español, visite www.Whirlpool.com

Table des matières

SÉCURITÉ DE LA SÉCHEUSE ................................................ 24
EXIGENCES D'INSTALLATION ...............................................26
Outillage et pièces ............................................................... 26
EXIGENCES D'EMPLACEMENT ............................................. 27
CANADA SEULEMENT ............................................................ 30
RACCORDEMENT D'UNE SÉCHEUSE À GAZ ...................... 30
RACCORDEMENT AU GAZ ..................................................... 33
ÉVACUATION ...........................................................................34
Exigences concernant l'évacuation ................................... 34
Planification du système d'évacuation .............................. 35
Installation du système d'évacuation ................................ 36
(MODÈLE À VAPEUR UNIQUEMENT) .................................... 37
RÉGLAGE DE L'APLOMB DE LA SÉCHEUSE........................ 39
INVERSION DE LA PORTE (FACULTATIF)..............................40
NOTES CONCERNANT L'INSTALLATION
_____________________________________
Date d'achat:
________________________________
Date d'installation:
______________________________________
Installateur:
________________________________
Numéro de modéle:
__________________________________
Numéro de série:
W11323401A
W11323423A-SP

Publicité

Table des Matières
loading

Sommaire des Matières pour Whirlpool W11323401A

  • Page 1: Table Des Matières

    ACHEVER L’INSTALLATION LISTE DE VÉRIFICATION ..39 LEVEL DRYER ................23 INVERSION DE LA PORTE (FACULTATIF)......40 COMPLETE INSTALLATION CHECKLIST ......23 DOOR REVERSAL (OPTIONAL)..........23 Para una version de estas instrucciones en español, visite www.Whirlpool.com INSTALLATION NOTES NOTES CONCERNANT L’INSTALLATION _________________________________ _____________________________________ Date of purchase: Date d’achat:...
  • Page 2: Dryer Safety

    DRYER SAFETY...
  • Page 3: What To Do If You Smell Gas

    WARNING: FIRE OR EXPLOSION HAZARD Failure to follow safety warnings exactly could result in serious injury, death, or property damage. – Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance. –...
  • Page 4: Installation Requirements

    INSTALLATION REQUIREMENTS Tools needed for gas installations: Tools and Parts Gather the required tools and parts before starting installation. Tools needed for all installations: 8" (203 mm) or 10" (254 mm) 8" (203 mm) or 10" (254 mm) pipe wrench adjustable wrench (for gas connections) Flat-blade screwdriver...
  • Page 5: Location Requirements

    Refer to your Use and Care Guide for information about accessories available for your dryer. LOCATION REQUIREMENTS Side view: Check code requirements. Some codes limit, or do not permit, Whirlpool Models installing dryer in garages, closets, mobile homes, or sleeping quarters. Contact your local building inspector. " (1378 mm) You will need: A location allowing for proper exhaust installation.
  • Page 6: Installation Clearances

    Recommended installation clearances (dryer only): Back view: " (159 mm) 3" (76 mm) 18" min. "* 48 in. min. (457 mm) (759 mm) Water inlet (310 cm (Steam Models Only) "* Vent "* (146 mm) (89 mm) 0–5" 24 in. min.
  • Page 7: Electrical Requirements - U.s.a. Only

    ELECTRICAL REQUIREMENTS – If your outlet looks like this: U.S.A. ONLY Then choose a 4-wire power supply cord with ring or spade terminals and UL Listed strain relief. The 4-wire power supply cord, at least It is your responsibility: 4 ft. (1.22 m) long, must have four 10-gauge To contact a qualified electrical installer.
  • Page 8: Electric Dryer Power Hookup - Canada Only

    ELECTRIC DRYER POWER HOOKUP – GAS DRYER POWER HOOKUP CANADA ONLY ELECTRICAL REQUIREMENTS ELECTRICAL REQUIREMENTS It is your responsibility: To contact a qualified electrical installer. ■ To be sure that the electrical connection is adequate and in ■ 120 V, 60 Hz, AC-only, 15 or 20 A fused electrical supply ■...
  • Page 9: Gas Supply Requirements

    GAS SUPPLY REQUIREMENTS Option 2 (Alternate Method) Approved aluminum or copper tubing: WARNING Must include 1/8" NPT minimum plugged tapping accessible ■ for test gauge connection, immediately upstream of the gas connection to the dryer. See illustration below. 1/2" IPS pipe is recommended. ■...
  • Page 10: Install Leveling Legs

    INSTALL LEVELING LEGS GAS SUPPLY CONNECTION REQUIREMENTS Use an elbow and a 3/8" flare x 3/8" NPT adapter fitting ■ between the flexible gas connector and the dryer gas pipe, as needed to avoid kinking. Use only pipe-joint compound. Do not use TEFLON tape.
  • Page 11: Make Electrical Connection - U.s.a. Only

    For direct wire installations: MAKE ELECTRICAL CONNECTION – U.S.A. ONLY ELECTRICAL CONNECTION Power Supply Cord: Remove terminal block cover Before you start: disconnect power. Choose electrical connection type Power supply cord 4-wire receptacle (NEMA Type 14-30R). Go to “Power Supply Cord Connection.” Power supply cord 3-wire receptacle (NEMA Type 10-30R).
  • Page 12: Power Supply Cord Connection

    Power Supply Cord Connection 4-Wire Power Supply Cord Connection IMPORTANT: A 4-wire connection is required for mobile homes Power supply cord strain relief and where local codes do not permit the use of 3-wire connections. Attach power supply cord strain relief 4-wire receptacle 4 prong plug (NEMA type 14-30R)
  • Page 13 Remove center screw Connect ground wire Connect ground wire (F) (green or bare) of power supply cord Remove center terminal block screw (B). under green external ground conductor screw (A). Tighten screw. Connect neutral wire Connect remaining wires Connect neutral wire (white or center) (C) of power supply cord under center terminal block screw (B).
  • Page 14: Direct Wire Connection

    Direct Wire Connection 4-Wire Direct Wire Connection IMPORTANT: A 4-wire connection is required for mobile homes Direct wire strain relief and where local codes do not permit 3-wire connections. Prepare your 4-wire cable Attach direct wire strain relief for direct connection Direct wire cable must have 5 ft.
  • Page 15 Remove center screw Connect ground wire Connect ground wire (green or bare) (F) of direct wire cable Remove center terminal block screw (B). under green external ground conductor screw (A). Tighten screw. Connect neutral wire Connect remaining wires Place hooked end of neutral wire (white or center) (C) of direct wire cable under center terminal block screw (B), hook Place hooked ends of remaining direct wire cable wires under...
  • Page 16 Optional External Ground for 3-Wire Connect external ground wire Connection (Power Supply Cord Shown) IMPORTANT: You must verify with a qualified electrician that this grounding method is acceptable before connecting. Prepare to connect neutral ground wire and neutral wire Connect a separate copper ground wire (G) under the green external ground conductor screw (A) to an adequate ground.
  • Page 17: Make Gas Connection

    MAKE GAS CONNECTION Plan pipe fitting connection (Option 1) (Gas models only) WARNING Explosion Hazard Use a new CSA International approved gas supply line. Install a shut-off valve. A. 3/8" flexible gas connector C. 3/8" to 3/8" pipe elbow Securely tighten all gas connections. B.
  • Page 18: Venting

    VENTING Exhaust hoods: An exhaust hood should cap the vent to keep rodents and ■ Venting Requirements insects from entering the home. Must be at least 12" (305 mm) from ground or any object ■ that may obstruct exhaust (such as flowers, rocks, bushes, or snow).
  • Page 19: Plan Vent System

    Plan Vent System Special provisions for mobile homes: Exhaust vent must be securely fastened to a noncombustible portion of mobile home and must not terminate beneath the Recommended exhaust installation: mobile home. Terminate exhaust vent outside. A. Dryer F. Rigid metal or flexible B Elbow metal vent C.
  • Page 20: Install Vent System

    Long Vent System Chart Connect vent to exhaust hood Number of Type Angled 90° elbows of vent hoods Rigid metal 160 ft. (48.8 m) Rigid metal 150 ft. (45.7 m) Rigid metal 140 ft. (42.7 m) Rigid metal 130 ft. (39.6 m) Rigid metal 120 ft.
  • Page 21: Connect Inlet Hose (Steam Model Only)

    CONNECT INLET HOSE Tighten couplings (STEAM MODEL ONLY) For non-steam models, skip to “Connect Vent.” The dryer must be connected to the cold water faucet using the new inlet hoses (not supplied). Do not use old hoses. NOTE: Replace inlet hoses after 5 years of use to reduce the risk of hose failure.
  • Page 22: Check For Leaks

    CONNECT VENT Attach long hose to dryer fill valve and tighten coupling Connect vent to exhaust outlet Using a 4" (102 mm) clamp, connect vent to exhaust outlet in dryer. If connecting to existing vent, make sure vent is clean. Dryer vent must fit over dryer exhaust outlet and inside exhaust hood.
  • Page 23: Level Dryer

    LEVEL DRYER COMPLETE INSTALLATION CHECKLIST Level dryer Check that all parts are now installed. If there is an extra part, go back through steps to see what was skipped. Check that you have all of your tools. Dispose of/recycle all packaging materials. Place Be sure the water faucets are on.
  • Page 24: Sécurité De La Sécheuse

    SÉCURITÉ DE LA SÉCHEUSE...
  • Page 25: Que Faire Dans Le Cas D'une Odeur De Gaz

    AVERTISSEMENT : RISQUE D ’ INCENDIE OU D ’ EXPLOSION Le non-respect des avertissements de sécurité peut causer des dommages à la propriété, des blessures graves, voire la mort. – Ne pas entreposer ou utiliser de l’essence ou d’autres vapeurs ou liquides in ammables à...
  • Page 26: Exigences D'installation

    EXIGENCES D’INSTALLATION Outils nécessaires aux installations au gaz : Outillage et pièces Rassembler les outils et composants nécessaires avant d’entreprendre l’installation. Outils nécessaires pour toutes les installations : Clé à tuyau de 8" (203 mm) Clé à mollette de 8" (203 mm) ou 10"...
  • Page 27: Exigences D'emplacement

    Des pièces supplémentaires seront peut-être nécessaires, selon Un plancher de niveau ayant une pente maximale ■ l’installation. Consulter les codes locaux. Vérifier l’alimentation de 1" (25 mm) sous l’ensemble de la sécheuse. Si la pente est supérieure à 1" (25 mm), installer un ensemble électrique et le circuit d’évacuation existants.
  • Page 28: Dimensions De La Sécheuse

    *Mesures approximatives (654 mm) Vue latérale : REMARQUE : La plupart des installations requièrent un espace minimum de 5" (127 mm) derrière la sécheuse pour le Modèles de Whirlpool conduit d’évacuation avec coude. Voir “Exigences concernant l’évacuation.” " (1378 mm) *Mesures approximatives Modèles de Maytag...
  • Page 29: Installation Dans Une Résidence Mobile - Exigences Supplémentaires

    Distances de dégagement à respecter Installation sous comptoir personnalisée : Pour chaque aménagement, prévoir davantage d’espace pour faciliter l’installation et l’entretien, des espacements pour les appareils voisins, les murs, les portes et les plinthes. L’espace doit être assez grand pour permettre l’ouverture complète de la porte.
  • Page 30: Sécheuse Électrique Raccordementà L'alimentation Électrique - Canada Seulement

    SÉCHEUSE ÉLECTRIQUE INSTRUCTIONS DE LIAISON À LA TERRE RACCORDEMENT À L’ALIMENTATION Pour une sécheuse reliée à la terre et connectée par ÉLECTRIQUE – CANADA SEULEMENT un cordon : Cette sécheuse doit être reliée à la terre. En cas de mauvais SPÉCIFICATIONS ÉLECTRIQUES fonctionnement ou de panne, la liaison à...
  • Page 31: Spécifications De L'alimentation En Gaz

    Cette sécheuse doit être équipée du brûleur convenable, ■ INSTRUCTIONS DE LIAISON À LA TERRE correspondant au gaz spécifique qui alimente l’habitation. L’information sur le brûleur se trouve sur la plaque Pour une sécheuse reliée à la terre et connectée par signalétique dans le logement de la porte de la sécheuse.
  • Page 32: Installation Des Pieds De Nivellement

    INSTALLATION DES PIEDS Au Canada : Un robinet d’arrêt individuel manuel doit être installé DE NIVELLEMENT conformément à la norme B149.1 du Code des installations au gaz naturel ou propane. On recommande qu’un robinet d’arrét manuel individuel soit installé à moins de 6 pi (1,8 m) de la sécheuse.
  • Page 33: Raccordement Au Gaz

    RACCORDEMENT AU GAZ Planifier le raccordement du raccord (modèles de sécheuses à gaz uniquement) (option 1) AVERTISSEMENT Risque d’explosion Utiliser une canalisation neuve d’arrivée de gaz approuvée par CSA International. Installer un robinet d’arrêt. A. Raccord de gaz flexible C. Coude de canalisation Bien serrer chaque organe de connexion de la de 3/8"...
  • Page 34: Évacuation

    ÉVACUATION Conduit métallique rigide Recommandé pour une meilleure performance de séchage ■ Exigences concernant l’évacuation et pour réduire les risques d’écrasement et de déformation. Conduit métallique flexible (Acceptable uniquement si accessible pour le nettoyage) Doit être complètement déployé et supporté dans ■...
  • Page 35: Planification Du Système D'évacuation

    Coudes : Les coudes à 45° permettent une meilleure circulation de l’air ■ que les coudes à 90°. Meilleur Brides de serrage : Utiliser des brides de serrages pour sceller tous les joints. ■ Le conduit d’évacuation ne doit pas être connecté ou fixé avec ■...
  • Page 36: Installation Du Système D'évacuation

    Installation du système d’évacuation Déterminer l’itinéraire d’acheminement du conduit : Choisir l’itinéraire d’acheminement vers l’extérieur qui sera ■ le plus direct et le plus rectiligne. Installer le clapet d’évacuation Planifier l’installation pour introduire le nombre minimal ■ de coudes et de changements de direction. Si des coudes ou changements de direction sont utilisés, ■...
  • Page 37: Raccordement Du Tuyau D'alimentation (Modèle À Vapeur Uniquement)

    RACCORDEMENT DU TUYAU Serrer les raccords D’ALIMENTATION (MODÈLE À VAPEUR UNIQUEMENT) Pour les modèles sans vapeur, passer directement à la section “Raccordement du conduit d’évacuation.” La sécheuse doit être connectée au robinet d’eau froide à l’aide des nouveaux tuyaux d’alimentation (non fournis). Ne pas utiliser de tuyaux usagés.
  • Page 38: Ouvrir Le Robinet D'eau Froide

    RACCORDEMENT DU CONDUIT Fixer le long tuyau à l’électrovanne D’ÉVACUATION de remplissage de la sécheuse et serrer les raccords Raccorder le conduit d’évacuation à la bouche d’évacuation À l’aide d’une bride de serrage de 4" (102 mm), relier le conduit d’évacuation à la bouche d’évacuation de la sécheuse.
  • Page 39: Réglage De L'aplomb De La Sécheuse

    RÉGLAGE DE L’APLOMB ACHEVER L’INSTALLATION DE LA SÉCHEUSE LISTE DE VÉRIFICATION Vérifier que toutes les pièces sont maintenant installées. S’il reste une pièce, passer en revue les différentes étapes Régler l’aplomb de la sécheuse pour découvrir laquelle aurait été oubliée. Vérifier la présence de tous les outils.
  • Page 40: Inversion De La Porte (Facultatif)

    INVERSION DE LA PORTE (FACULTATIF) Un technicien qualifié est requis pour effectuer l’inversion de la porte, consulter la section “Assistance ou service” dans le “Guide d’utilisation et d’entretien. W11323401A ©2018 All rights reserved. Used under license in Canada. W11323423A-SP Tous droits réservés.

Ce manuel est également adapté pour:

W11323423a-spWed5620hw

Table des Matières