11b PROCEDURE FOR SAFETY INSPECTION
All inspection and repair work must be noted in the inspection schedule. This applies not
only to your own inspection work but also to inspection work carried out by your authorised
REMA dealer. When the equipment is submitted for maintenance and inspection, the
maintenance report must always be provided.
Defective Lifting Clamp
On discovering any form of wear or damage, the following measures must be taken.
1 Take the lifting clamp out of operation. (Note down the date of decommissioning the
lifting clamp)
2 Try to find the cause of the defect, for example (see full list under point a):
Overloading
- Improper use (the clamp is not suitable for dragging and securing materials)
- Non-sensible use
- Rough use
Any such damage is not covered by the warranty! Please follow this procedure in order to
guarantee your safety and that of your colleagues/personnel.
3 Hand in your lifting clamp with maintenance history to your authorised REMA repair
shop.
4 Once the clamp has been revised/repaired by your repair shop, it can be used again. Note
down the date of re-commissioning in the maintenance table.
11c INSPECTION SCHEDULE
Months
Years
Safety inspections by
your own inspector
Maintanance by an
authorised
(REMA)repairshop
Revision by an
authorised (REMA)
repairshop
4
8
12
16
20
1
2
15
24
28
32
36
40
3
44
48
52
56
60
4
5

Publicité

Table des Matières
loading

Table des Matières