In Operation; Installation / Connection - Elster Instromet SM-RI-X Manuel D'instruction

Compteurs de gaz à turbine
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Turbine gas meter Instruction Manual

In Operation

Installation / Connection

Before installation please ensure that
- the protective caps or plastic sheeting's are removed.
- the meter and accessories have been inspected for transport damage.
- the accessories have been checked for completeness.
- the line is free of obstacles and pollution.
You will require the following items for installation:
- suitable gaskets for the relevant gases.
The following gaskets, among others, are suitable:
 flat seals,
 spiral-wound gaskets
 grooved seals and gaskets.
 Nuts, stud bolts or hexagon screws according the flange directive.
Then install the meter:
 preferably in horizontal position with index at the top.
If you wish to install the unit vertically and if an oil pump is present, the oil
pump must also be fitted vertically.
 only in flow direction,
 stress-relieved,
 with the supplied accessories,
 gas-tight,
When fitting the gaskets, ensure that they are aligned concentrically and do not
project into the flow channel.
Elster-Instromet b.v.
Honeywell
Tel: +31 (0) 315 338911
Copyright © 2011 Elster.All rights
reserved.
www.elster-instromet.com
2.550.484 Rev. 2
ENG
10

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Q-75

Table des Matières