Description; Principal Components; Function; In General - GÖLZ KB 125 Mode D'emploi

Foreuse carotteuse
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

KB 125
Bedienungsanleitung / Operating instructions / Mode d'emploi

3.0 Description

3.1 Principal components

In figure 3-1 the most important principal components are shown. For detailed drawing of the
core drill rigs refer to the drawing of explosion.
The core drill rig is made of 6 principal components:
1.
Carriage / Feed
2.
Column / Arbor
3.
Dowel base
4.
Support jack
5.
Swan neck motor adapter
6.
Cross handle

3.2 Function

3.2.1 In general

The adjustable core drill rig emanates from the production run of core drill rigs made for drilling with
diamond drills. These drills are adapted for drilling in concrete, asphalt and rock. The function of the
drill rig is to bring the drilling machine into position and to guide it during the drilling. Regarding the
maximum diameter for these drill rigs see the technical data sheet.
The core drill rig may not be used
for applications other than those
mentioned above!
- 18-
02951250999
5004593-02

Publicité

Table des Matières
loading

Table des Matières