5.3. Wall mounting
•
When selecting the installation location, make sure that the wall material is suitable and robust. The
mounting surface should be flat and vertical.
Installation steps
1.
Use for the wall material suitable screws.
2.
Fasten the upper screw 1270 mm measured from the ground surface.
The plug holder will be at a height of 1200 mm.
LERAK131B_20221004
EV Charging Station
7
max. Ø5
31 / 68