Initial Commissioning - Bosch Start Line TCE 420 Notice Originale

Machine à monter les pneus
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 50
en
34 | Start Line TCE 420 | Unpacking
9. To connect the air hose, open the side panel of
machine housing, then attach the air hose to the
straight connector.
10. Assemble the bead-breaker blade, then fasten the
screws.
11. Loosen the anchor bolt, push the mounting arm
to the innermost position, and prepare the lifting
device.
|
1 695 108 074
2016-07-27
6.

Initial commissioning

6.1
Initial commissioning
Installation environment requirement:
Initial commissioning
Temperature
Sea level
Humidity
at 40 °C
at 20 °C
1. When selecting the installation location, ensure that
the TCE 420 is safe when it is used under normal
operating conditions.
2. The TCE 420 must be connected to the voltage
supply and compressed air suppl; we thus
recommend that the TCE 420 be set up close to
these two utilities.
3. Installation position should at least leave the space
in the following figure to secure free movement of
each part of the machine.
4. If the TCE 420 is installed outdoors, you should
take measures to protect it from rain and sun. The
TCE 420 is not intended to be used outdoors.
5. The work are should enjoy enough light to secure
the operators can observe each details of the
operation.
!
Besides the operator, no other personnel should be
in the work area when the machine is running.
Requirement
4 - 40 ºC
<1000 m
50%
90%
Robert Bosch GmbH

Publicité

Table des Matières
loading

Table des Matières