LA 22TBS - LA 28TBS
4
Transport
ATTENTION!
When transporting the heat pump, ensure that it is not tilted
by more than 45° (in any direction).
A pallet should be used to transport the heat pump to its final
installation location. The basic device can be transported with a
lift truck, hand truck or by means of 3/4" pipes fed through the
holes in the base plate or frame (max. pipe diameter in the evap-
orator-compressor frame area, 25 mm). In the frame area, the
pipes must run parallel to the operator side (see figure)
The heat pump and the transport pallet are joined by four tran-
sit bolts. These must be removed.
Before using the transport holes in the frame, it is necessary to
remove the two bottom side panel assemblies. Each covering
panel is secured with two screws. The screw holes are closed
with plastic covers. These plastic covers must be inserted in the
relevant screw holes again once the covering panels have been
mounted again. If the plastic covers are not inserted, the func-
tion of the plate insulation may be impeded due to rain water
entering! Once the screws have been loosened, the covering
panels can be tilted (top plates by approx. 20°, bottom plates by
approx. 45°). The bottom facade plates can then be pulled out
of the skirt panel, the top facade plates, which do not have to be
removed for transport, can be hung out of the cover plate. Re-
hang the top panels by gently pushing them in an upwards di-
rection.
NOTE
Be careful not to damage any components when inserting the
pipes through the frame.
Any transport holes are to be covered at the installation location
using the 8 black dust caps, which are included in the packag-
ing of the device.
www.gdts.one
Once the heat pump has been set up in its intended location,
the transport fastenings (2x M6 screws) must be removed from
the compressor plate (the front or rear panel at the bottom
must be removed for this)
transport lock
ATTENTION!
Before commissioning, the transport fastening must be
removed.
452166.66.01 · FD 9912
English
EN-5