Télécharger Imprimer la page

Ozone Angel Mode D'emploi page 13

Publicité

4
Now prepare the panels and lines neatly. Using a parachute line
spacer helps with this stage but is not mandatory.
Angel 140
Start by organising the panel 10 and 11 either side of the double
apex line. Now fold panels 9 to 1 on top of panel 10 so that they
lay neatly and so that the lines are organised either side of the
apex lines.
Angel 110 Start by organising the panel 9 and 10 either side of the double
apex line. Now fold panels 8 to 1 on top of panel 9 so that they
lay neatly and so that the lines are organised either side of the
apex lines.
All manuals and user guides at all-guides.com
4b
4a
4c
9

Publicité

loading