ASSEMBLY
TOOLS REQUIRED:
• None
ASSEMBLY INSTRUCTIONS: (SEE FIGURE 2)
1. Stand the cultivator assembly upright with tines and wheels on
a level surface. Wheels should be set in the lowest position. DO
NOT place the tiller cultivator on a high surface where it can fall
and cause property damage or personal injury.
2. Using two three-knob nuts (A), two saddle bolts (B), and two
curved washers (C), attach the middle handlebars (D) to the
lower handlebar (E) that is already connected to the cultivator
assembly. The middle handlebars can be installed in one of three
height positions. DO NOT overtighten the three-knob nuts.
3. Join the two upper handlebars to one another by inserting the
one with the button pin (F) into the other (G) until the button
pin snaps into place.
C
A
B
D
Figure 2
Get parts online at www.getearthquake.com or call 800-345-6007 M-F 8-4:30 CST.
H
F
G
E
4. Attach upper handlebar assembly to the middle handlebars
using the two remaining three-knob nuts, saddle bolts, and
curved washers. DO NOT overtighten the three-knob nuts.
5. Four spare tine clips (H) are included. These can be installed into
the four holes on the upper handlebar assembly.
6. Connect the control cable from the upper handlebar to the
cable on the powerhead by joining the connectors (I) at each
end of the cables. Use the three zip ties (J) to secure the cable
along the handlebar sections. SEE FIGURE 3
7. After everything is assembled and connected, tighten down the
four three-knob nuts.
I
J
Figure 3
Operator Manual
60V Cultivator
7