2190 Dagenais Blvd. West
Laval (Quebec)
Canada
H7L 5X9
see us at
Your pump has been carefully packaged at the
factory to prevent damage during shipping. However,
occasional damage may occur due to rough handling.
Carefully inspect your pump for damages that could
cause failures. Report any damage to your carrier or
your point of purchase.
INITIAL START UP PROCEDURES :
1. Inspect the pump and the sewage
tank for any obvious condition that
may necessitates cleaning, correction,
adjustment or repair.
2. Assure that the pump is secure and
vertical for proper operation.
3. Assure that there is adequate clearance
from any combustible materials or
structure. Stored materials must be
kept away from the pump. Shelves
or cabinet structures must not be in
close proximity over the pump.
4. Assure that the motor is securely
plugged into a proper 'GFCI' electrical
outlet.
5. Test the 'GFCI' outlet by pressing its
test switch. This should prove that the
outlet is energized and will trip off to
protect against a ground fault. Be sure
to reset the 'GFCI' by pressing its reset
switch. (Repeat this step monthly).
6. Lift the float to assure that the pump
will start when required. (Step 7 below
will test submersible pumps with
enclosed floats).
7. Pour pails of water in the sewage tank
to turn the pump on. Assure that any
check valve present will permit the
sewage to flow.
8. Observe that the plumbing can pump
the sewage safely out of the residence.
(Repeat this step monthly).
Tel. : 514.337.4415
Fax : 514.337.4029
info@burcam.com
www.burcam.com
INSTALLATION
INSTRUCTIONS
Please read these
carefully. Failure
© 2024 BURCAM Printed in Canada 400385
MODEL
400401T
SEWAGE
PUMP
instructions
to comply to
instructions and
designed
operation of
this system,
may void
the warranty.