2190 Dagenais Blvd. West
LAVAL (QUEBEC)
CANADA
H7L 5X9
Your pump has been carefully packaged at the
factory to prevent damage during shipping.
However, occasional damage may occur due to
rough handling. Carefully inspect your pump
for damages that could cause failures. Report
any damage to your carrier or your point
of purchase.
INITIAL START UP PROCEDURES:
1.
Inspect the pump and the sewage tank for
any obvious condition that may
necessitates cleaning, correction,
adjustement or repair.
2.
Assure that the pump is secure and
vertical for proper operation.
3.
Assure that there is adequate clearance
from any combustible materials or
structure. Stored materials must be kept
away from the pump. Shelves or cabinet
structures must not be in close proximity
over the pump.
4.
Assure that the motor is securely plugged
into a proper 'GFCI' electrical outlet.
5.
Test the 'GFCI' outlet by pressing its test
switch. This should prove that the outlet is
energized and will trip off to protect against
a ground fault. Be sure to reset the 'GFCI'
by pressing its reset switch.
(Repeat this step monthly)
6.
Lift the float to assure that the pump will
start when required. (Step 7 below will test
submersible pumps with enclosed floats).
7.
Pour pails of water in the sewage tank to
turn the pump on. Assure that any check
valve present will permit the sewage to flow.
8.
Observe that the plumbing can pump the
sewage safely out of the residence.
(Repeat this step monthly)
© 2012 BUR-CAM Printed in Canada 450373
www.burcam.com
TEL: 514.337.4415
FAX: 514.337.4029
info@burcam.com
INSTALLATION
INSTRUCTIONS
MODEL
400505
SEWAGE
Please read these
carefully. Failure
to comply to
instructions and
may void the
PUMPS
instructions
designed
operation of
this system,
warranty.