Télécharger Imprimer la page

ATH-Heinl W102 Mode D'emploi page 63

Publicité

2.4
Location
The machine should be kept away from flammable and explosive materials, as well as from sunlight and
intense light. The machine should be placed in a well-ventilated location.
The machine must be set up on sufficiently firm ground, if necessary, according to the minimum
requirements of the information given in the foundation plan.
In addition to the ground conditions, the guidelines and instructions of the accident prevention regulations
as well as the workplace regulations must be observed when selecting an installation site.
When assembling on floor coverings, check their load-bearing capacity. A construction expert should be
consulted for inspection when mounting on floor coverings.
The machine should only be mounted and used within closed rooms. It has no corresponding safety
features (e.g. IP protection, galvanised design, etc.).
Temperature
Sea level
Humidity
2.5
Fixing
General and local regulations must be observed. Therefore, these steps should only be
carried out by a trained professional.
The machine must be set up and fixed on sufficiently firm ground, if necessary, according to the minimum
requirements of the information given in the foundation plan.
The machine must be fastened at the points provided with suitable or specified fastening material.
In addition to the ground conditions, the guidelines and instructions of the accident prevention regulations
as well as the workplace regulations must be observed when selecting an installation site.
When assembling on floor coverings, check their load-bearing capacity. A construction expert should be
consulted for inspection when mounting on floor coverings.
® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2020-03
All manuals and user guides at all-guides.com
4-40 °C
< 1500 m
50% at 40 °C – 90% at 20 °C
Manufacturer ATH-Heinl GmbH & CO.KG
- 17 -

Publicité

loading